30 Ton Electric Arc Furnace
Night vision function:
Goods gross weight:
Shelf time:
Product description:
1. Technical parameter
Nominal tapping capacity 30T
Average tapping 30T(hot heel: 8 tons)
Shell internal diameter Ф4300mm
Method of charging Top (using charging buckets)
Method of tapping EBT
Side wall construction Water cooled ,tubular
Forward tilting angle (tapping) 20°
Backward tilting angle (slagging) 12°
Roof construction Water-cooled, tubular
Roof lifting distance 400mm
Roof rotation angle 68°
Electrode diameter Ф450mm (UHP electrode)
Pitch circle diameter Ф1000mm
Electrode lifting distance 3100mm
Electrode traveling speed 6 / 4 m/min(up/down, automatic)
Transformer capacity 18MVA+20% (overload)
Primary voltage 33KV, 3P, 50Hz
Cooling mode OFWF
Three phase unbalance ≤5%
Hydraulic pressure 12MPa
Water pressure 0.4MPa
Inlet water temperature ≤35℃
Outlet water temperature ≤55℃
Total water consumption 500 m3/h, emergency water 180 m3/h (for 30mins)
Water quality Industrial clean water
Oxygen flow rate 2000Nm3/h (average)
2. Supply list
SN Item Qty Remark
1 Mechanical parts
1.1 Furnace body (upper shell, lower shell, accessory) 1 set Upper shell: tubular
1.2 Tilting platform mechanism 1 set
1.3 Water cooled roof 1 set Tubular
1.4 Roof lifting and rotating mechanism 1 set
1.5 Electrode traveling mechanism 1 set Electrode arm & master
1.6 EBT platform 1 set
1.7 Rotation frame locking device 1 set
1.8 Electrode nippling device 1 set 4 pcs. cells
1.9 Cooling water distributor 1 set With instrument
2 Electrical parts 1 set
2.1 Transformer 18MVA/33kV c/w hydro-oil cooler 1 set China top make
2.2 High voltage switchboard 1 set GBC-40.5kV panel
2.3 Short network 1 set c/w water cooled cables
2.4 Lower voltage control panels 1 set GGD type panel
2.5 PLC automation and HMI system 1 set Siemens PLC, S7-300
3 Auxiliary items
3.1 Hydraulic power pack 1 set Proportional valve & pump make: Parker
3.2 Door lance manipulator & carbon injection device 1 set
Supplied by the Buyer:
1) Furnace refractory lining, hydraulic medium, lubrication medium and cleaning medium, graphite electrodes;
2) Civil works and design (Seller provides furnace foundation drawings and civil work requirements), embedded furnace foundation parts;
3) Water supply and gas supply main inlet are laid to Seller’s equipment connection point, H.V. incoming line to Seller’s H.V. panel and furnace transformer terminals, L.V. are connect to Seller’s L.V. distribution panel.