50t Electric Arc Furnace
Night vision function:
Goods gross weight:
Shelf time:
Product description:
1. Technical parameter
Nominal tapping capacity 50t
Average tapping capacity 60t
Shell internal diameter Ф5000mm
Electrode traveling system Hydraulic
Method of charging Top (using charging buckets and hopper)
Method of tapping EBT
Side wall construction Water cooled ,tubular
Forward tilting angle (steel tapping) 20°
Backward tilting angle (slag tapping) 12°
Roof construction Water-cooled, tubular
Roof lifting distance 400mm
Roof rotation angle 65°
Electrode diameter Ф500mm
Pitch circle diameter Ф1200mm
Electrode lifting distance 4500mm
Electrode traveling speed 9 / 6m/min (up/down)
Transformer capacity 40MVA+20% (long term)
Primary voltage 20kV, 3P, 50Hz
Cooling mode OFWF
Short net Impedance ≤0.65+j2.7mΩ
Three phase unbalance ≤5%
Hydraulic pressure 12MPa
Hydraulic medium Water-glycol
Water pressure 0.4MPa
Inlet water temperature ≤35℃
Outlet water temperature ≤55℃
Total water circulation flow 700 m3/h
Emergency water 200 m3 (for 30mins.)
Furnace shell weight 100t
Compressed air working pressure 0.8MPa
Oxygen working pressure 0.8-1.0MPa
Natural gas working pressure 0.4MPa
2. Supply list
SN Item Qty Remark
1 Mechnical parts
1.1 Furnace body (upper shell and lower shell) 1 set
1.2 Tilting mechanism 1 set
1.3 Water cooled roof and water pipe 1 set Tubular,
1.4 Roof lifting and rotating mechanism 1 set
1.5 Electrode arms and traveling mechanism 1 set
1.6 EBT platform 1 set
1.7 Rotation frame locking device 1 set
1.8 Feeding hopper(on the roof) 1 set
1.9 Electrode nippling station 1 set 4 nos.,
1.10 Cooling water distributor 1 set
2 Electrical parts
2.1 Transformer 40MVA/20kV c/w hydro-oil cooler 1 set China top make
2.2 20kV high voltage system (GBC40.5kV panel) 1 set Schneidar china VCB
2.3 Short network 1 set
2.4 Lower voltage system 1 set
2.5 PLC automation and HMI system 1 set Siemens PLC S7-300
3 Auxiliary items
3.1 Hydraulic power pack 1 set Proportional valve & pump make: Parker
3.2 Compressed air device 1 set
3.3 Lubrication station 1 set Xi’an or Qidong
3.4 Water cooled door oxygen lance 1 set with hydraulic station
3.5 CNG, oxygen, carbon wall lance (3 pcs.) 1 set with valves stand
3.6 Steel temperature & measuring thermometer 1 set with LED display
Supplied by the Buyer:
1) Installation and installation materials, Hydraulic medium, lubrication medium and cleaning medium, Graphite electrodes, Furnace refractory lining;
2) Civil works and design (Seller provides furnace foundation drawings and civil work requirements), embedded furnace foundation parts;
3) Water supply and gas supply main inlet are laid to Seller’s equipment connection point, H.V. incoming line is connected to Seller’s H.V. panel and furnace transformer terminals, L.V. line is connected to Seller’s L.V. distribution panel.